
Domains
Bridges & other Structures
Client
Construtora do Tâmega, aka, Tâmega Engineering
Final client
ICOR (Instituto para a Construção Rodoviária)
Time frame
Construction cost
€36'000'000
Services
- Design
Phases
- Preliminary studies
- Construction design
- Preliminary design