Expertise >

Bridge over the Douro River in Entre-os-Rios

Portugal

Domains

Bridges & other Structures

Client

Construtora do Tâmega, aka, Tâmega Engineering

Final client

ICOR (Instituto para a Construção Rodoviária)

Time frame

Construction cost

€36'000'000

Services

  • Design

Phases

  • Preliminary studies
  • Construction design
  • Preliminary design