
Domains
Bridges & other Structures;River engineering
Client
Egyptian French JV (Leader Vinci Construction)
Time frame
Construction cost
$370'000'000
Services
- Design
Phases
- Final design
- Construction design
Domains
Client
Time frame
Construction cost
Services
Phases