The Project
The road surface on Nelkenstrasse was in poor structural condition. The main drainage pipe (d=500 mm) showed significant damage. The pipes had reached the end of their service life and were replaced along the entire length of Nelkenstrasse.
The Jona-Rapperswil Electric Utility (EWJR) and the Rapperswil-Jona Water Utility (WVRJ) took the opportunity to replace their utility lines along Nelkenstrasse. In addition, both utilities carried out replacement work on the privately owned Blumen- and Lilienstrasse. This work was performed primarily using open-trench methods, with some sections completed using trenchless technology.

Key Data
• New road construction (base course, curbs, and paving) (260 m)
• Replacement of road surface (150 m)
• Sewer and road drainage (150 m)
• Replacement of G125 fire hydrant line (WVRJ)
• Replacement of electrical distribution system (EWJR)