Expertise >

Billund Airport New Passenger Terminal

Denmark

Domains

Airports

Client

Billund Airport

Time frame

Construction cost

€380'000'000

Services

  • Design
  • General planner

Phases

  • Preliminary studies
  • Final design
  • Permit-obtaining procedure
  • Tender design
  • Preliminary design

The Project

In 2002, Billund Airport was expanded with a 40,000 m² passenger terminal designed by ARX (KHR), capable of handling 3.5 million passengers annually. The design integrates with the natural landscape, offering views of the Danish hills to the north and flight operations to the south. The new terminal frees the former one for expanded cargo use. Located north of the runway, it includes new taxiways, a multi-storey car park, and off-road parking. Set on the edge of a hill island, the project emphasizes the terrain, preserving nearby woodland and enhancing surrounding heathland and hedgerows as part of the airport’s landscape design.


 

Gallery